Accessing and Reviewing Activator Documents


How you access a document in Activator depends on whether it has been published to a DAM (Digital Asset Management system) and whether you have accessed it before.


If the document has NOT been published

  • The document remains a working draft in Activator

  • It is available to users who have the appropriate permissions and profile access

  • You can open, review, and edit it directly in Activator

Use this when collaborating on drafts or making early changes


If the document HAS been published to a DAM

First-time access (you have never opened the document before)

  • The document exists as a controlled asset in the DAM

  • It will not appear automatically in your Activator workspace

  • You must import it from the DAM into Activator for it to become part of your document list

Steps:

  1. Go to your DAM system

  2. Locate the document

  3. Import it into Activator (AC3)

  4. The document will now appear in your Activator workspace for review or editing


If you have already accessed the document before

  • The document may already be visible in your Activator workspace


Key takeaway

  • Unpublished = available directly in Activator (based on permissions)

  • Published = managed in DAM

    • First-time access → Import required

    • Already accessed → May already be available in Activator


This workflow ensures that all users work from the correct, most up-to-date version of the document while keeping content centrally managed in the DAM.